Monday, 23 January 2012

stud walls

  1. The first thing we had to do was to make sure we had the correct P.P.E (gloves, goggle and boots). we wore gloves to protect our hands from splinters in the wood. we wore goggles to protect our eyes from any flying Debee. we wore boots to protect our feet from any heavy objects that could be dropped.
  2. The first thing we did was to make sure we had the correct equipment then we could mark out the measuremeant on the timber.
  3. Once we marked out all the timber and checked it we then had to cut every thing down to size. 
  4. Then we layed all the cut bits of timber in order making sure every thing fits together. we then had  to fix the frame together we done this using nail.
  5. Once it was all fitted together we then put it up making sure it was perfect fit and then made it secure.
  6. We then cleaned up making sure the tool and spare material went back.
  7. We then reported that the job were done. 
  8. the next stage was to fit the door frame.

leveling pegs

  1. The first we did was to get our P.P.E on ( gloves, goggle and boots) we wore glove to protect our hands from the splinters in the pegs. we wore boots in case we were to drop something heavey on our boots. we wore goggles to protect our eyes from any debree. 
  2. Once we got all of our P.P.E on we then had to set up the lazer level. we had to make sure that the lazer level was level because otherwise all the pegs wont be the correct hight.
  3. Then all we had to do is to pick a place for the peg and then hammer it in then use the meashureing staff with the lazer registor on it. then just hammer it in to size
  4. After we each hammerd in five pegs each we then had to pull all the pegs out and make sure that we bought all the equipment in.
  5. Final we repoted that the job were done.