Wednesday, 18 April 2012

test: plasterboarding bay

  • The first thing we done was to make sure that we had the correct P.P.E (goggls, steel toe capped boots and gloves). we wore gloves to protect our hands from the gypsum inside plasterboard. we wore steel toe capped boots to protect our feet from heavy object. we wore goggles to protect our eyes from the gypsum dust in the air.
  • we then got all the materials and tools that we need (knife, tap measure, pencil and spirit level.
  • we first measured the bay then we transferd those mesurement on to the plaster board so that it was ready to cut
  • once all the marking out were done we then began to cut down the marked line. We done this using a retratable knife and a spirit level we put the spirit level alone the marked line so that it was more acurate.
  • once the plasterboard was cut we  then fitted it useing dry wall screws
  • once all the bit of plasterboard was fitted we then had to clean the tools and tidy our bays and the workshop.
  • once it was ll tidy we reported that the job was done.      