- the first thing we done was to make sure that we are wearing the correct P.P.E (gloves, goggles and steel toe capped boots). we wore gloves to protect our hands from splinters. we wore goggles to protect our eyes from foreign objects. we wore steel toe capped boots to protect our feet from heavy objects.
- the next thing we done was to get all the equipment and materials that we needed (skirting, dado rail, mitre saw pencil and a coping saw.
- i then measured the lengh of the material that i needed and cut a 45 degree angle and highlighted the out line of the cut and got the coping saw and cut the scribe.
- i the fitted the skirting and dado rail to my bay and made sure that it all fitted within tolerance.
- finaly i cleaned up and reported that the job were done.
This is the final resault