Thursday, 8 December 2011

3 - 4 - 5

  1. we first made sure we had our boots on and any other P.P.E required for we were going though the brick work shop.
  2. we then got all the materials and tools needed (string line, bricks and tap measure)
  3. we then went out side and measured 3 meters one and for the 4 meters another way so that it form a ruff right angle. we then measured it at an angle it had to be 5 meter if not then we just changed it a bit.
  4.  we then took it down and made sure everything was put back clean.
  5. finally we report that the job were done. 