3 - 4 - 5
- we first made sure we had our boots on and any other P.P.E required for we were going though the brick work shop.
- we then got all the materials and tools needed (string line, bricks and tap measure)
- we then went out side and measured 3 meters one and for the 4 meters another way so that it form a ruff right angle. we then measured it at an angle it had to be 5 meter if not then we just changed it a bit.
- we then took it down and made sure everything was put back clean.
- finally we report that the job were done.