- we first put on our boots and any other P.P.E for we were going though the work shop.
- we then got the lazier and set it up we had to make sure that the lazier was perfectly level.
- we then measure the height of the lazier on the flat.
- then we went down the hill and got a stake and hammered it in to the ground and then we got the measuring stick with the beeper attached to it to see how much more we have to go down. we done this at least three times each
- we then checked them and then took all the stakes out and put the lazier back
- we then reported that the job were done
Sunday, 4 December 2011
lazer leveling